Answer Posted / kunal sharma
means above the plinth level
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
What is the development length given in pile?
Exterior Joints,define
List out some of the common problems that architect have to tackle it?
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
What is the quantity of cement in mix m20 concrete?
What is specific gravity???
how much cost of single coat 20mm thick plastering per sqre meter
Describe the sections included in a typical bill of quantities
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
what is mean by reestimation?