1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answers were Sorted based on User's Feedback
Answer / shahul hameed
1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0
= 10-1+ 1 + 1 + 1 + 1 + 1+0
=9+5 =14
Is This Answer Correct ? | 14 Yes | 0 No |
Answer / er shalu verma
1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0
=(1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1) - 1 + (1 + 1 + 1 +
1 + 1) + (1 x 0)
=10-1+5+0
=15-1
=14
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / dharmendra ray
1+1+1+1+1+1+1+1+1+1-1+1+1+1+1+1+1x0
=1+1+1+1+1+1+1+1+1+1-1+1+1+1+1+1+0
=15-1+0
14
Is This Answer Correct ? | 3 Yes | 0 No |
how do you calaculate the total steel quantity of an rcc building using thumb rule?
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
Slump Values for works?
0 Answers Aditya Constructions, SVS Constructions,
what is the ratio of m50 grade in concrete block
the size of one block is 390mm×190mm×190mm.then how much block will required for 4.6m × 3.4m wall.the thickness of wall is 190mm
What is difference between limit state and working stress method? How it is applies in building structure.
what is pmc(in rigid pavement)
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
For the construction project what capital cost has to be taken in consideration?
strenth of brick
how to find the carpenter work per day? how many cubic feet they should be work per day?
types of piles detail,
0 Answers DLF, IVRCL, JP Group,