1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answer Posted / shahul hameed
1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0
= 10-1+ 1 + 1 + 1 + 1 + 1+0
=9+5 =14
| Is This Answer Correct ? | 14 Yes | 0 No |
Post New Answer View All Answers
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
How to calculate unit weight of concrete for m40 grade.
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
Howmuch bend to be provide for 200/600 BEEM
why do we provide haunches in rcc box or underpasses?
How do you maintain water pressure?
What is Time period of a building and its relation with frequency ?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
Why is the statue of liberty made of copper?
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
How to calculate construction cost of residential building in mumbai
Will going from a 3-tap to 6-tap increase water pressure?
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
what is the mode of method of face bar measurement