a concrete mix 1 2 4 by volume with water cement ratio as .6
by weight if moisture content in F.A is 6% with 20% BULKING
AND IN C.A 1.5% by volume. find quantities of different
materials required for one bag of cement
No Answer is Posted For this Question
Be the First to Post Answer
what is the procedure for batching plant calibration??????
As a proof of my analytical skills I was asked to give an example of a real life situation that i have solved analytically ? Can anybody give me a clue what kind of examples should be a suitable answer ?
what interested you in becoming a civil engineer?
which I.S. code shown wastage in structural steel
use 1:1.5:3 concrete footing size 9'9" *9'9" and square 12" and also trapezoidal 22" use of 4 columns. calculate how much amount f concrete use. and also tell me the details about course aggregate and fine aggregate and cement bags use .(note; 20mm coures aggregate use)
What is meant by cartesian coordinate system?
what is difference between open and well foundation ?
Q:What is the formula of bar to bent the slab in bent slab? Second question Q: what is formula to calculate the hook?
How do you prepare Material Recovery Statement for deduction from contractors bills?
what would be the design load of R.C.C Cooling tower per cell.?
Why is DPC not provided at sills of doors?
the plan area of a building 10*15 of superstructure 0.30 then plinth area is
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)