the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C

1691


What is the basic difference between OPC

1550


how to clculate the %of concrete strenght achive after curing?load

2058


sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.

1590


I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?

2018






What is Critical path in Ms-Project ?

798


Sir how to find cutting length for footing steel bars in the shape of "u"

1417


Which type of plywood & sizes using in construction projects ?

744


What do you mean by tolerance factor of concrete ?

2764


what is the percentage of silt in black cotton soil.?

2045


Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire

1251


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

2157


std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30

1698


How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)

1832


For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate

1270