Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
plumbing CPVC fitting FTE Brass full form
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
What is the material consumption- cement,sand,tiles etc for Toilet dado?
Why nautical mile is different from statute mile?
Define What is rigging?
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
How much cement and water required for cement selery????
can you give me the details of rate analysis of steel and concrete?
what do you understand by M25 concrete
what are the layers of the national and heir aprox thickness??
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?