Slump Values for works?
No Answer is Posted For this Question
Be the First to Post Answer
What do you mean by "M-30"?
sometimes, in a column, reinforcement is provided equally on 2 sides and sometimes on 4 sides.what will be the difference in the method of designing?
What is the the difference between piller base and wall base ? give cost difference ?
How many square meter can a worker/labor demolish a structure per day?
How to calculate carrying capacity of the existing water supply trunkmain
How Much span required for 1 sqm of shuttering(Beam & Slab)
what shape of coarse aggregates are ideal for concreting?
what is the meaning or full form of 12T13 cables used in prestressed bridges
how to consider the lap length of a bar in IS code and specify the code book name and clause& page number?
what is main diffrence between vitrified and cremic tile????
2 Answers Colliers International,
1. why we use inverted beam ? 2.why we use extra bar in beam ? 3.dimension in L-bar in column ,footing and beam
what is the maximum number of course that can be laid according to IS code and the max height.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)