Slump Values for works?
No Answer is Posted For this Question
Be the First to Post Answer
Construction joint of beam & slab is provided at––
What is type failure of road surface? how to repair the failure of road surface?
How may digree of freedon in four bar chain.
weight rcc m30
what is the minimum % of steel use in columns ?
What salary do you expect? to a 10 yrs experienced civil engineer?
where you provide overlap on column?
a wall having area 100 sqft and bricks size 19cm*9cm*9cm so how many bricks required...
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
0 Answers Talib and Shamsi Constructions,
How we can calaculate materials required for block work(1m3) block size 33cm x 20 cm x 17 cm, mortar 1:6
how to calculate cut length of for a triangular portion for steel ?
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)