1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answer Posted / venkatesh
14
| Is This Answer Correct ? | 11 Yes | 3 No |
Post New Answer View All Answers
Can we use concrete of slump cone in cube casting in which we have already measured slump?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
rate analysis hiring of generator 62.5 KVA
Please let me know what is the simplest way of Calculating Mix Designs
residential projects,structural.
Floor tile measurement? Wall to wall or skirting to skirting
what is the difference between natural draught cooling tower and induced draught cooling tower
What is the difference between undo & redo?
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
How high should the water tank be to provide a 60 psi at base of this water tower?
What is the purpose of the gap in the road on this bridge?
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
what is differences between ferrock and concrete ?
Material calculation of cm 1:6 for 1sqm