Answer / bilal riaz chughtai
a limti state mehtod is a condition beyound which structure no longer fulfill the design criteria.
in working stress method it is assumed that plane section in bending will remain plane after bending.
stress strain relationships will obey hookx law.
Is This Answer Correct ? | 8 Yes | 2 No |
Answer / rethina kumar
working stress method is classical method to design structure element. for ie:- if we design beam (r) any other element its reinforcement requirement will be more than actual requirement.
in limit state method design will be based on factored load. reinforcement will be corresponding factored load. design section and Ast can use economically.
Is This Answer Correct ? | 5 Yes | 2 No |
What is the correct position of lapping splice of reinforcement steel bars in a beam at top & bottom of the beam?? what is the reason for this location?..what are the factors affecting lapping location in beam?
What is Time period of a building and its relation with frequency ?
L/3 and l2 and 1.5l is use for reiforcement
For 1 cu m of concrete required 1.54 Cu m times dry volume. Pl give clarification of 1.54 factor
1 Answers RASA, Unity Infraprojects,
WHAT IS FLOOR AREA RATIO? Y IS IT NECESSARY? HOW TO CALCULATE IT?
how can change 10mm dia @275 c/c bar spacing to 12 mm
how many hacking to be made in one sqft for concrete surface before plastering as per the IS Code
rcc concrete grade uses
what is the procedure to make compressive strength test for concrete cube in lab
Which is the most prominent tower of world?
how to decide cement quantity in 1 m3 concrete
How to estabilish reinforcement Steel rolling margin for a building projects ?