1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answer Posted / er shalu verma
1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0
=(1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1) - 1 + (1 + 1 + 1 +
1 + 1) + (1 x 0)
=10-1+5+0
=15-1
=14
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
Why are pull-out tests performed for soil nails?
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
Who built the sears tower?
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
Define relative co-ordinates?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
For Wet Mix Mecadam design what is Optimum moisture content
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
Explain the design for rcc multi-storied building?
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?