1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answer Posted / er shalu verma
1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0
=(1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1) - 1 + (1 + 1 + 1 +
1 + 1) + (1 x 0)
=10-1+5+0
=15-1
=14
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
what are the types of design? which type of method is used at what type of design & why?
How many lbs are there in a yard?
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
How to calculate chejja reinforcement
what is the water cement ratio for plastering
at which depth the construction of tunnel is economical from cost and engineering aspect.
Define different types of roof systems?
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
What is a bearing capacity of soil?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
What is the primary difference between adsorption and absorption?
how to conversation of all construction material in to brass