1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answers were Sorted based on User's Feedback
Answer / muhammad abid
ans is zeero.
because any num. multiply o is ans=0
| Is This Answer Correct ? | 6 Yes | 11 No |
Answer / akhtar shaikh
Answer is : 6
Because as per the math rule
first equation will be 1 x 0 = 0
then 1+1+1+1+1+1+1+1+1+1 - 0+1+1+1+1+1+1
= 6
| Is This Answer Correct ? | 1 Yes | 14 No |
why cylinder for split tensile strength test ?
how to take out quantity of steel used in column and beam?? what is standard formula for it???
material calculations for I st coatplastering 16mm CM (1:5),second coat CM(1;3)4mm thick,pcc(1:4:8),RCC M20,lime stone masonry CM(1:6)
What is the % steel required for a 3x3 slab.
Why shear forces are usually neglected in column design?
rate analysis hiring of generator 62.5 KVA
What is the difference between opc cement to ferro cement
Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
Camber of 15 mm is to be provided at free end of the cantilever what dose it mean??
What is the Compressive strength of concrete C40/20 at 7days
Explain what are the problems one might face while having a Cantilever balcony?
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)