1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answers were Sorted based on User's Feedback
Ans. must be 14.but the question is we r engineer or not?if
we r engineer then we should give the right ans. if we r
not knowing the ans then we should avoid it.,this is the
good website,so pls. dont put such type of silly question
here.
Is This Answer Correct ? | 1 Yes | 0 No |
14 is correct ans.
Update your knowlage
kids.....
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / nadim
1+1+1+1+1+1+1+1+1+1 = 10 - 1 = 9+1+1+1+1+1+1 = 15x0 = 0
Is This Answer Correct ? | 5 Yes | 7 No |
Answer / sk
From above answer we realise the demerits of reservation.
1-add
2-deduct
3-multiply
4-divide
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / shinto4real
The ans is 0. Anything multiplied by 0 is 0. It'll only make a difference if it was written with brackets.
Is This Answer Correct ? | 0 Yes | 4 No |
How many percentage extra considering in PEB roof sheet ?
What is the proportion of cement agg. and sand for M20,M25 and M30?
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
why in india readymade structure is impossible in residence houses?
Minimum and maximum size of the building components
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
How to calculated +ve & -ve Bending moment coefficient in water tank design for design of side walls.
How to fix steel in rectangular footins? I.e first along the length or first along the width??
Form where IS456 is adopted in 1978?
how many tonnes equals to one cubic feet?
What is the ring size of column 600x400 (8mm dia ring) ?
3 Why do you want to work at our company?