For the construction project what capital cost has to be taken in consideration?
No Answer is Posted For this Question
Be the First to Post Answer
What is Pavement & carrage way?
How many square meter can mason layout chb per hour
What are the advantages of cad software’s?
WHAT IS THE LAP LENGTH FOR COLUMN WITH DESIGN MIX M-35 RCC
7 Answers Omaxe, Shoba Devlopers,
How to find the requirement of cement and sand for the 1cum of rr masonry work
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
i Have Completed a Intermediate Vocational (Construction technology) with Bridge course ,iam elegible to join in Institute of Surveyors(india).
what radial pressure, the NP2 class rcc pipe can sustain?
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
How to fix steel in rectangular footins? I.e first along the length or first along the width??
Water absorption for stone and first class stone bricks?
Please tell me 1 Sqm Steel 14mm center to center .200,.200
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)