Answer / girish rawat
ON AN AVERAGE 1 CARPENTER I SEMI SKILLED CARPENTER AND 1
HELPER WITH GIVE YOU AN OUTPUT OF 10 TO 12 M2 OF SHUTTERING.
IT DECREASES IF YOU ARE FIXING BEAM BOTTOM OR STEP FOOTING.
IT INCREASES DURING COLUMN FIXING AND SLAB DECK SHUTTERING.
Is This Answer Correct ? | 45 Yes | 3 No |
Answer / md.sami
door,window work comes under furniture carpenter, if you ask wooden carpenter no will get you
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / geethu
i hav asked about wood carpenter output?(doors,windows)
Is This Answer Correct ? | 0 Yes | 3 No |
Answer / harish
average one carpenter one helper they give out put of 12-
14m2of shuutering
Is This Answer Correct ? | 4 Yes | 10 No |
which chemical is used for corroded steel
Where on net can i find IS Codes?
WHICH ONE IS THE ECONOMICAL CONSTRUCTION SOLID BLOCK CONSTRUCTION OR BRICK CONSTRUCTION?
why we providing 40mm cover to columns & 25mm to shear wall
Why we use sin wave only in ac not use any other form of wave?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
What is geographic meridian?
Can you tell the dia of bars and spacing for a 16'x16' room can you tell the dia of bars and spacing to be used for a slab for a 16'x16' room or any other design you explain
During estimation of walls of superstructure...which unit we'll use with quantity.cube or square
OPC 43 OR PPC for rcc structures(raft foundation,column etc)? For M20,,which cement is better and why? for a residential structure (3 storey plus basement)
mix design procedure for 1:6 cement mortar