how to find the carpenter work per day? how many cubic feet
they should be work per day?

Answers were Sorted based on User's Feedback



how to find the carpenter work per day? how many cubic feet they should be work per day?..

Answer / girish rawat

ON AN AVERAGE 1 CARPENTER I SEMI SKILLED CARPENTER AND 1
HELPER WITH GIVE YOU AN OUTPUT OF 10 TO 12 M2 OF SHUTTERING.
IT DECREASES IF YOU ARE FIXING BEAM BOTTOM OR STEP FOOTING.
IT INCREASES DURING COLUMN FIXING AND SLAB DECK SHUTTERING.

Is This Answer Correct ?    45 Yes 3 No

how to find the carpenter work per day? how many cubic feet they should be work per day?..

Answer / nagu

1 carpenter 2 helper 4 to 6m2 per day so 8hours

Is This Answer Correct ?    3 Yes 1 No

how to find the carpenter work per day? how many cubic feet they should be work per day?..

Answer / md.sami

door,window work comes under furniture carpenter, if you ask wooden carpenter no will get you

Is This Answer Correct ?    1 Yes 0 No

how to find the carpenter work per day? how many cubic feet they should be work per day?..

Answer / geethu

i hav asked about wood carpenter output?(doors,windows)

Is This Answer Correct ?    0 Yes 3 No

how to find the carpenter work per day? how many cubic feet they should be work per day?..

Answer / harish

average one carpenter one helper they give out put of 12-
14m2of shuutering

Is This Answer Correct ?    4 Yes 10 No

Post New Answer

More Civil Engineering Interview Questions

which chemical is used for corroded steel

3 Answers  


Where on net can i find IS Codes?

9 Answers  


WHICH ONE IS THE ECONOMICAL CONSTRUCTION SOLID BLOCK CONSTRUCTION OR BRICK CONSTRUCTION?

4 Answers  


why we providing 40mm cover to columns & 25mm to shear wall

1 Answers   NCC,


Why we use sin wave only in ac not use any other form of wave?

3 Answers   L&T,






Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day

0 Answers  


when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?

0 Answers  


What is geographic meridian?

1 Answers  


Can you tell the dia of bars and spacing for a 16'x16' room can you tell the dia of bars and spacing to be used for a slab for a 16'x16' room or any other design you explain

1 Answers  


During estimation of walls of superstructure...which unit we'll use with quantity.cube or square

5 Answers   ABC,


OPC 43 OR PPC for rcc structures(raft foundation,column etc)? For M20,,which cement is better and why? for a residential structure (3 storey plus basement)

3 Answers  


mix design procedure for 1:6 cement mortar

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)