how much cement is required for 100 sft plastering of ratio
1:4
Answers were Sorted based on User's Feedback
Answer / ahmed j (if u any question to
Thikness Of Plaster 18 To 20mm
Sand in 1Cubic mtr =1.25 For All Ratio
Cement in 1 Cubic mtr For
1.3 = .21
1.4 = .31
1. Thikness Of Plaster For 1st Coat is Roush Coat 12mm
*Propotion of C:M For 1st Coat With Ratio 1:6 , 1:5,
2. Thikness Of Plaster For 2nd Coat is Fine Coat 6 to 8mm
*Propotion Of C:M For 2nd Coat With Ratio 1:4 , 1:3
Area Is 100sft / 3.28^2 =
9.295 * 0.008=
Area * Thikness
0743*.31=
Volume * Ratio
0.023*1440=
Quantity * Cement Volume
Cement Quantity Required Is 33.20 Kgs (With Out Wastage)
Is This Answer Correct ? | 35 Yes | 15 No |
Answer / qudrat
what is the cost of cement for plaster 2'' for the ratio of 1 to 4
Is This Answer Correct ? | 7 Yes | 3 No |
Answer / shailesh srivastava
6mm thk far 1 sqm
Qty executed=1x1x.006
20% extra for voids & wastage=.0012
total =.0072
30% extra for dry =.00216
Total required qty =.00936 cum
Cement =.00936/5
=.001872 cum
far 1 sqft =.001872/10.76
far 100 sqft =100*.001872/10.76cum
=100*1440*.001872/10.76
=25.052 kg
Is This Answer Correct ? | 9 Yes | 19 No |
Answer / ndd
In this question plastering thikness is not mentioned.
Consider,plastering ( Cement and sand)thickness = 10mm
100 Sqft = 9.29 Sqm
-------------------------------------------------------
Wet Mortar volume= 9.29 X 0.01Cum =0.0929 Cum
Dry Mortar volume = 0.0929 X 1.15 =0.106835 Cum
Cement = 1/4 X 0.106835 X 1400 Kg =37.392 Kgs
(Volume of cement is ignored )
Hence for 100 Sqft area,and 10mm thick plastering the
cement quantity required = 37.40 Kgs ( Without wastage)
Is This Answer Correct ? | 7 Yes | 20 No |
Answer / karthikeyan.n
1 sq.m = 10.76 sq.ft.
100 sq.ft = 9.29 sq.m
cement required for 10 sq.m = 3/(1+4)=.6*1440/50 = 17.28bag,
100sq.ft cement required = 1.728*9.29 = 16.05 bags
Is This Answer Correct ? | 34 Yes | 93 No |
Hi all, need Staad Pro V8i tutorial
how to calculate valuation for the old building?
what is difference between footing and foundation?
Given a selection of 28 day cube test results for concrete placed of design mix C 35 and not all of which are greater then 35 MPa, how does one decide if the concrete in place is satisfactory. Are there a minimum number of cubes that need to be tested to decide that?
What is the volume of 50kg cement bag?
Differentiate first angle & third angle projection?
in the construction of building,we are use formula for laping? such that how many formulae we use? which are them?
what would be the rqmnt. of cement and sand (1:6)for building brick wall and also 20mm thick plaster on the wall by same ratio?
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
develpement lengh
what is the cement mortor thickness for 23 cm brick work and 11.5 brickwork?
How can I make justification between using concrete grade c35 compare c37?