Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how much cement is required for 100 sft plastering of ratio
1:4

Answers were Sorted based on User's Feedback



how much cement is required for 100 sft plastering of ratio 1:4..

Answer / wilson

Ans is 1.16 bag or 58.50 kg only

Is This Answer Correct ?    72 Yes 26 No

how much cement is required for 100 sft plastering of ratio 1:4..

Answer / ahmed j (if u any question to

Thikness Of Plaster 18 To 20mm

Sand in 1Cubic mtr =1.25 For All Ratio
Cement in 1 Cubic mtr For
1.3 = .21
1.4 = .31

1. Thikness Of Plaster For 1st Coat is Roush Coat 12mm
*Propotion of C:M For 1st Coat With Ratio 1:6 , 1:5,

2. Thikness Of Plaster For 2nd Coat is Fine Coat 6 to 8mm
*Propotion Of C:M For 2nd Coat With Ratio 1:4 , 1:3


Area Is 100sft / 3.28^2 =

9.295 * 0.008=
Area * Thikness

0743*.31=
Volume * Ratio

0.023*1440=
Quantity * Cement Volume

Cement Quantity Required Is 33.20 Kgs (With Out Wastage)

Is This Answer Correct ?    35 Yes 15 No

how much cement is required for 100 sft plastering of ratio 1:4..

Answer / qudrat

what is the cost of cement for plaster 2'' for the ratio of 1 to 4

Is This Answer Correct ?    7 Yes 3 No

how much cement is required for 100 sft plastering of ratio 1:4..

Answer / shailesh srivastava

6mm thk far 1 sqm

Qty executed=1x1x.006
20% extra for voids & wastage=.0012
total =.0072
30% extra for dry =.00216
Total required qty =.00936 cum
Cement =.00936/5
=.001872 cum
far 1 sqft =.001872/10.76
far 100 sqft =100*.001872/10.76cum
=100*1440*.001872/10.76
=25.052 kg

Is This Answer Correct ?    9 Yes 19 No

how much cement is required for 100 sft plastering of ratio 1:4..

Answer / ndd

In this question plastering thikness is not mentioned.
Consider,plastering ( Cement and sand)thickness = 10mm

100 Sqft = 9.29 Sqm
-------------------------------------------------------
Wet Mortar volume= 9.29 X 0.01Cum =0.0929 Cum
Dry Mortar volume = 0.0929 X 1.15 =0.106835 Cum

Cement = 1/4 X 0.106835 X 1400 Kg =37.392 Kgs
(Volume of cement is ignored )

Hence for 100 Sqft area,and 10mm thick plastering the
cement quantity required = 37.40 Kgs ( Without wastage)

Is This Answer Correct ?    7 Yes 20 No

how much cement is required for 100 sft plastering of ratio 1:4..

Answer / karthikeyan.n

1 sq.m = 10.76 sq.ft.
100 sq.ft = 9.29 sq.m

cement required for 10 sq.m = 3/(1+4)=.6*1440/50 = 17.28bag,

100sq.ft cement required = 1.728*9.29 = 16.05 bags

Is This Answer Correct ?    34 Yes 93 No

Post New Answer

More Civil Engineering Interview Questions

9*9 1:4:8 ratio using for p cc work please tell quantity 40mm aggregate ,sand &cement

8 Answers   L&T,


What is the best mixture ratio in building a power plant? what is the weight of a 1 sack cement? what is the density of a cement?

1 Answers   Alfaraa, CMC,


what are the tests to be done for grout material, and procedure for compressive strength test procedure for grout material?

1 Answers  


How to replace dia of bar in beam like 25mm 3no.S at bottom But due to some reason on site 25mm bar is not available Then is it ok to provide 20mm 4no.S? Give description or Formula to calculate area of steel and replacement?

3 Answers  


Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.

19 Answers   DNA Infrastructure, HCC, L&T,


how to know rcc strength

2 Answers   L&T,


Civil engineering related

0 Answers   HSS, Jaypee,


state the main objectives of underpinning

4 Answers  


Describe the term BILL OF QUANTITY (BOQ)?

4 Answers  


How to calculate cement, aggregates for any one grade of concrete for icum?

1 Answers   Megha Constructions, MEIL, Student,


Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??

0 Answers   NCC,


how many bricks are required for masonary trench having length of 31 mtr, depth of 0.6 mtr and breadth of 0.45 mtr on single brick work as well as double ( 9" ) brick work

5 Answers   IEC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)