Given a selection of 28 day cube test results for concrete placed of design mix C 35 and not all of which are greater then 35 MPa, how does one decide if the concrete in place is satisfactory. Are there a minimum number of cubes that need to be tested to decide that?
2 3224Post New RPS Interview Questions
What is different in C++, compare with unix?
What is the use of linux?
What does edit scenarios mean in excel?
How can a developer utilize hive?
what is minimal vs. Verbose monitoring?
What does cascading mean in css?
The user has chosen a windows instance with classic and the user want to make some change to the security group. How will these changes be effective?
What is the way to rollback transaction if something goes wrong using hibernate api?
What are the applications of cycloconverter?
What are the ethical concerns surrounding AI in transportation?
What are the differences between PIG and SQL?
How do you tell what ports are open on router?
Can you partition a cube which has data already? : bw on hana
How do I connect to a postgresql database using sql developer?
Explain the difference between instance store and ebs?