how much cement is required for 100 sft plastering of ratio
1:4
Answer Posted / karthikeyan.n
1 sq.m = 10.76 sq.ft.
100 sq.ft = 9.29 sq.m
cement required for 10 sq.m = 3/(1+4)=.6*1440/50 = 17.28bag,
100sq.ft cement required = 1.728*9.29 = 16.05 bags
| Is This Answer Correct ? | 34 Yes | 93 No |
Post New Answer View All Answers
why is the column design?
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
how to calculate the chair reinforcement length in slabs, footing or anywhere??
it is possiblee to produce concrete with out cracks...
why development length = 50D . why not 100D
For the construction project what capital cost has to be taken in consideration?
how calucate cement sand ratio for plstering
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
What is change order request?
Define What is rigging?
whats is difference between anchorage length and development length
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
i want texture painting pwd data
What is the meaning of a blue land surveyors flag?
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?