how much cement is required for 100 sft plastering of ratio
1:4
Answer Posted / karthikeyan.n
1 sq.m = 10.76 sq.ft.
100 sq.ft = 9.29 sq.m
cement required for 10 sq.m = 3/(1+4)=.6*1440/50 = 17.28bag,
100sq.ft cement required = 1.728*9.29 = 16.05 bags
| Is This Answer Correct ? | 34 Yes | 93 No |
Post New Answer View All Answers
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
What is rate of concrete surface rendering work per sqm
Why should you consider yourself fit to be hired by jindal steel.
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
What is kn measurement?
How much does the leaning tower of pisa lean?
why development length = 50D . why not 100D
(Project Management Topic) What are the important criteria in the successful realization of the project?
Cement consumption of one cubic meter of aerocon blocks masonry?
how to calculate mivan shuttering matrial
What is the minimum size of the particles of silt soil?
How did the romans get water up hills using aqua ducts?
Why was the empire state building made of steel?
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?