how much cement is required for 100 sft plastering of ratio
1:4
Answer Posted / wilson
Ans is 1.16 bag or 58.50 kg only
| Is This Answer Correct ? | 72 Yes | 26 No |
Post New Answer View All Answers
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what are RIB slabs explain about it
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
Which IS Code/American Code applied for coupler test of steel
During reclamation how can the occurrence of mud waves can be rectified?
How is the leaning tower of pisa supported?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
What is the release of lien?
what is shuttering co efficient?
How do you convert wind speed into force?
How to determine spacing of bars in slabs or beams
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
what is the calculation of raw material for 0.35cum of m-15