Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how much cement is required for 100 sft plastering of ratio
1:4

Answer Posted / wilson

Ans is 1.16 bag or 58.50 kg only

Is This Answer Correct ?    72 Yes 26 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

if dia of slab beam bar is38mm what its clear cover any method of provide clear cover

2051


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2084


what are RIB slabs explain about it

2642


CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL

2152


Which IS Code/American Code applied for coupler test of steel

2624


During reclamation how can the occurrence of mud waves can be rectified?

1295


How is the leaning tower of pisa supported?

1055


What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.

2437


what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?

2562


What is the release of lien?

1176


what is shuttering co efficient?

1890


How do you convert wind speed into force?

1312


How to determine spacing of bars in slabs or beams

2462


I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2

2310


what is the calculation of raw material for 0.35cum of m-15

1449