Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how much cement is required for 100 sft plastering of ratio
1:4

Answer Posted / ahmed j (if u any question to

Thikness Of Plaster 18 To 20mm

Sand in 1Cubic mtr =1.25 For All Ratio
Cement in 1 Cubic mtr For
1.3 = .21
1.4 = .31

1. Thikness Of Plaster For 1st Coat is Roush Coat 12mm
*Propotion of C:M For 1st Coat With Ratio 1:6 , 1:5,

2. Thikness Of Plaster For 2nd Coat is Fine Coat 6 to 8mm
*Propotion Of C:M For 2nd Coat With Ratio 1:4 , 1:3


Area Is 100sft / 3.28^2 =

9.295 * 0.008=
Area * Thikness

0743*.31=
Volume * Ratio

0.023*1440=
Quantity * Cement Volume

Cement Quantity Required Is 33.20 Kgs (With Out Wastage)

Is This Answer Correct ?    35 Yes 15 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how many cement used in single story residential building per sqft

1756


I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.

2100


why we can use dust in concrete insted of fly ash

2142


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

1506


For a washout valve why are two gate valves required in normal practice?

1163


Describe the sections included in a typical bill of quantities

2285


What does civil status mean?

1210


For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.

2061


how to find ssm in foundation?

1948


crank types

2362


Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.

2241


percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters

2150


What is horizon or horizontal mining?

1131


What is proportion of PCC Grade G?

2066


In which code the the maximum height of concrete casting has been explained

2879