how much cement is required for 100 sft plastering of ratio
1:4
Answer Posted / ahmed j (if u any question to
Thikness Of Plaster 18 To 20mm
Sand in 1Cubic mtr =1.25 For All Ratio
Cement in 1 Cubic mtr For
1.3 = .21
1.4 = .31
1. Thikness Of Plaster For 1st Coat is Roush Coat 12mm
*Propotion of C:M For 1st Coat With Ratio 1:6 , 1:5,
2. Thikness Of Plaster For 2nd Coat is Fine Coat 6 to 8mm
*Propotion Of C:M For 2nd Coat With Ratio 1:4 , 1:3
Area Is 100sft / 3.28^2 =
9.295 * 0.008=
Area * Thikness
0743*.31=
Volume * Ratio
0.023*1440=
Quantity * Cement Volume
Cement Quantity Required Is 33.20 Kgs (With Out Wastage)
| Is This Answer Correct ? | 35 Yes | 15 No |
Post New Answer View All Answers
undistributed samples are obtained by
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
What are the applications of the modulus of elasticity?
Calculation of curtain wall of box culvert
difference between fc and fc'?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
What is Base Shear ?
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
how many time use of plywood shuttering and IS code
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
what is the ingredient value of 40mm and 20mm aggregates?
can any one explain bar bending schedule of bems and columns and slabs ??
Define What is the difference between routing maintenance and major maintenance in school facilities?
How you read 5x3x1 #4 @ 20" 0/C in steel structure?