develpement lengh
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
what are the forces acting on gantry girder
Is it possible 18" beam rest on 18" beam and created the junction on beam instead of column?
What should be the 28 days cube strength for M-25 grade concrete?How it is connected with acceptance criteria of fck+3 as per IS 456-2000 and why?
4 Answers IVRCL, NCC, Simplex, Tata Steel Limited,
How to calculate the design of column by simple method?
What is code for designing a sheet pile?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
Hello sir,I am preparing for GET,Jindal steel & power limited.So can u plz send me few back papers including technical & aptitude.
how much quantity of bending wire required for 1sqmts
What are the reasons for geotechnical site investigations in uganda?
Terms Name the bars which is used in beam and colume ? Like starter bar etc.
Why Vitrified tile are getting pop up.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)