how much cement is required for 100 sft plastering of ratio
1:4
Answer Posted / qudrat
what is the cost of cement for plaster 2'' for the ratio of 1 to 4
| Is This Answer Correct ? | 7 Yes | 3 No |
Post New Answer View All Answers
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
I what know about life time of frp tank plz explain about it specifications & other details
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
as per is code, what is the minimum content of opc and ppc cement for rcc structure
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
What is the difference between a wood shake and wood shingles?
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
satart to end steps by step process of building construction...? i want to planning theme accuretly
Define a polyline?
what r the precaution for high in atp tempareture,low in atp tempareture
In a concrete grade C35A, C & A stands for what and equalent cube strength?
What are the responsibilities of a site manager?
what is the steel difference between np-2 and np-3 pipes and weight also