in the construction of building,we are use formula for
laping? such that how many formulae we use? which are them?
Answers were Sorted based on User's Feedback
Answer / us rao
lapping length depends on grade of concrete,type of
steel,whethere in tension or compression area.kidly refer
is 456 page 42 for the formula.
| Is This Answer Correct ? | 7 Yes | 1 No |
Answer / manoj dagar
To get lap
1 we use ( 50 x
dia ) formula .
2 caplar formula.
3 according to
Drawing
| Is This Answer Correct ? | 7 Yes | 2 No |
Answer / prabu (structural engineer)
lap length:
it is defined as min legth required to transfer the load from on rod to another rod.
for compression = 46* dia of rod
for tension = 48* dia of rod
but in construction field = 50* dia of rod (both comp and tension )
if two differ size rod meet = lap length = 50* min dia of rod
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / engr
Depends upon the design , we consider while designing
| Is This Answer Correct ? | 0 Yes | 0 No |
How to find concrete quantity for a circular column ?
Define What are the materials used in building a gravity dam?
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
0 Answers Ras Engineering, UltraTech,
What is the procedure of Waterproofing in toilet sunken area ?
Explain the mechanism of cavitations in pipes and drains?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
1) why bent up are provided at l/4 or l/5 distance not at l/8or l/10? 2) why extras are provided in beams at top and why upto 0.3l distance max.? 3) why chairs are provided in two way slab?
what is chicken mesh?explain its use
what will be the quantity of matterial and water for pcc in 1 cubic meter , the ratio is 1:4:8 (cement:sand:aggr) ?
how much tempareture are required to make liquid state of pid leed
Tell us your experience in Interior Design and Architectural Firms?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)