Answer / vaibhav jadhav
Any is code not give the clause regarding demolishing of
structure if cube fails in 28 days. but IS 456 & 516 give
the clause if strength of cube is less than FCK then
proceed for NDT Test i.e Rebound hammer if fail then go for
Ultrasonic test after all the NDT fail then proceed for
Core cutter also if U found result less then FCK then go
for Retrofitting with suggestion of consultant.
Is This Answer Correct ? | 33 Yes | 2 No |
Answer / abhijit
ensist contractor to hold skilled man power with quallity
material. note the result in daily work progress and mark
on structure which is not as per specification. finally go
for NDT if also structure fails then we have to demolish &
reconstruct the same
Is This Answer Correct ? | 37 Yes | 10 No |
Answer / nravindran
Go for NDTest, if it is not satisfied go for Core test that
is also failed go for concrete strengthing process As per
structural consultant comments
Is This Answer Correct ? | 19 Yes | 4 No |
Answer / vimalsekar
Well. When Concrete cube test result fails at 28th day then
go for concrete core cutting and check the compressive
strength in it. Number of cores shall be as per the
engineer incharge's decision but should not be less than 3
nos. IS:456 says if the core test fails then go for load
test. IS : 456 also says that NDT can be done . But with
rebound hammer test only surface hardness will be known and
hence this test result is not reliable and hardly anyone
suggests for this test.
Is This Answer Correct ? | 18 Yes | 3 No |
Answer / shafqat
Use concrete tester rebound hammer for strength after
calibration.
Perform test as per standard,if results is more than 100 %
of requirement by calibration graph of hammer continue the
structure.
Is This Answer Correct ? | 11 Yes | 3 No |
Answer / kishorecivil
NDT testing has to be done and if it fails then go for
recto method that is strengthing of concrete and concern is
not demolish it's time taken and it will effect time and
finacial.
Is This Answer Correct ? | 8 Yes | 7 No |
Answer / prabhakara rao.b
Go for NDT If it is not satisfied go for Core test that
is also failed go for there possibale demolisan that coloum
it is not possible we go for Restrengthing.
Is This Answer Correct ? | 4 Yes | 3 No |
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
you are a civil engineering student so what you have done to improve your knowdge
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
What is the order of MIX Design of concrete? a)Cement :Stone:Sand b)Cement :Fine aggregate :Coarse Aggregate?
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
what is the material consumption of 1:2:4 by kilogram?
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
how much thickness of roof truss?
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?
Deduction in length of reinforcement steel for bar bending
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
convert area- 1 war = meter, 1 guntha = meter