Cube tests of concrete are failed at 7 days and 28
days.What is your next action?
Answer Posted / nravindran
Go for NDTest, if it is not satisfied go for Core test that
is also failed go for concrete strengthing process As per
structural consultant comments
| Is This Answer Correct ? | 19 Yes | 4 No |
Post New Answer View All Answers
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
How is calculate the cube molt
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
What is the l/d ratio of cantilever beam?
construction workers how much time take one work or qty
Who built the sears tower?
how many cement used in single story residential building per sqft
how to identify the failure of building by expansive soils
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
types of piles detail,
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
How do you calculate the power of centrifugal pump?