Cube tests of concrete are failed at 7 days and 28
days.What is your next action?
Answer Posted / nravindran
Go for NDTest, if it is not satisfied go for Core test that
is also failed go for concrete strengthing process As per
structural consultant comments
Is This Answer Correct ? | 19 Yes | 4 No |
Post New Answer View All Answers
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
insted of bentonite we can use any alternate material in piling ?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
what is smart building materials?
How do you calculate load bearing capacity of a waffle slab?
HOw much % of premium on DSR-2013 currently
what is the 0 value in quantity surveying
how many type of admixtures for water stored structure?
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
"Gates of the dams are generally designed of curved shape". Why?
what is escalation?how it is done?
Different sizes of Hollow blocks and its weight. Thanks.
Why are steel plates inserted inside bearings in elastomeric bearing?
Formula of mid span bar
what is work of planning deptt. in any construction compny (in road project)