Cube tests of concrete are failed at 7 days and 28
days.What is your next action?
Answer Posted / vimalsekar
Well. When Concrete cube test result fails at 28th day then
go for concrete core cutting and check the compressive
strength in it. Number of cores shall be as per the
engineer incharge's decision but should not be less than 3
nos. IS:456 says if the core test fails then go for load
test. IS : 456 also says that NDT can be done . But with
rebound hammer test only surface hardness will be known and
hence this test result is not reliable and hardly anyone
suggests for this test.
| Is This Answer Correct ? | 18 Yes | 3 No |
Post New Answer View All Answers
If specific gravity of cement is less than 3.15 what is the cause?
What is the use of array command?
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
Why joints are provided?
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
what is smart building materials?
what is the weight of 12mm aggregates?
what is meant by shear center?????
How many feet are in 4 square yards?
how i get all type of short type question answer about civil engg
What are the advantages and disadvantages of using plastic and timber fenders?
What is the difference between yeild strength and compressive strength of steel???
What is an ortho mode?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
Trapezoidal section footing calculation of Volume & its Area