Cube tests of concrete are failed at 7 days and 28
days.What is your next action?
Answer Posted / vimalsekar
Well. When Concrete cube test result fails at 28th day then
go for concrete core cutting and check the compressive
strength in it. Number of cores shall be as per the
engineer incharge's decision but should not be less than 3
nos. IS:456 says if the core test fails then go for load
test. IS : 456 also says that NDT can be done . But with
rebound hammer test only surface hardness will be known and
hence this test result is not reliable and hardly anyone
suggests for this test.
| Is This Answer Correct ? | 18 Yes | 3 No |
Post New Answer View All Answers
When column of building is abutting the boundary line,then suitable footing advised is
explain the rale of the government in the construction industry
Mention different types of roof systems?
Formula of mid span bar
How you can use different dimension tools in cad? What are the different dimensions available?
what is kribs is supporting?
how much area can be platered by a mason for exterior
I need old MMUP exam question and answer for Civil engineering
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
What is bylayer?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
Why are steel plates inserted inside bearings in elastomeric bearings?
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
How can you achieve soil enforcement?