Cube tests of concrete are failed at 7 days and 28
days.What is your next action?

Answer Posted / kishorecivil

NDT testing has to be done and if it fails then go for
recto method that is strengthing of concrete and concern is
not demolish it's time taken and it will effect time and
finacial.

Is This Answer Correct ?    8 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?

778


types of survey and levelling instrument ?

1284


what is pile and deam foundation

1813


what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?

1782


The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it

5564






How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?

10654


What are the advantages of cad?

645


In block work seawalls what is the purpose of slip joints?

764


what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?

1884


How do you measure water flowing through 300mm diameter pipes?

711


If specific gravity of cement is less than 3.15 what is the cause?

1877


what is the construction cost for per cft of multistorryed building in kolkata?

1789


Difference between pre-tensioning and post-tensioning.

690


How to make a c++ program that converts any base to base 10?

1625


What are your goals?

2123