Cube tests of concrete are failed at 7 days and 28
days.What is your next action?
Answer Posted / prabhakara rao.b
Go for NDT If it is not satisfied go for Core test that
is also failed go for there possibale demolisan that coloum
it is not possible we go for Restrengthing.
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
150mm bricks size how many use 4.14 m3
What is the difference between chamfer and fillet?
Explain what is 1/8 on the architect ruler denotes?
What is the zero value in quantity surveying
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
whats is difference between anchorage length and development length
Define angular dimension?
what is Bearing Capacity,How to determine it?
How good are the Weinerberger Porotherm bricks that are being used in construction in Chennai, India. Its being used in non load bearing walls and has a compressive strength greater that 35 kg/cm^2 and a density of approx.694 - 783 kg/m3.
How to calculate the quantity of ingredients of M20 grade concrete?
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
What is costing in 100squre feet bricks
What is oneside mat. And explain
how to calculate the strength of rebound hammer test reading in building construction ?