Cube tests of concrete are failed at 7 days and 28
days.What is your next action?

Answer Posted / abhijit

ensist contractor to hold skilled man power with quallity
material. note the result in daily work progress and mark
on structure which is not as per specification. finally go
for NDT if also structure fails then we have to demolish &
reconstruct the same

Is This Answer Correct ?    37 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to estabilish reinforcement Steel rolling margin for a building projects ?

3651


how to calculate MR 9(derivation)

2322


what is the theoritical percentage of concrete cubes testing per day?

4395


What is the average density of soil?

679


How many square meter can a worker/labor demolish a structure per day?

1526






What ingredients with% found in ppc cement??

1599


what is work of planning deptt. in any construction compny (in road project)

1889


Dear Sir What is the Contraction joint for base Slab

1663


how many minimum admixtures are used in water froofing structures

1852


how many running meters in one kilogram of 4mm pvc coated chainlink fencing

647


can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???

1453


Why you are leaving present job?

1605


how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend

1601


how many time use of plywood shuttering and IS code

2694


what is the cost of rcc roof casting of 400 sq. ft. in kolkata

3238