Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


for basic costing, how can we calculate how much amount of steel and cocrete will go in per sqft? and what are the thumbrules?



for basic costing, how can we calculate how much amount of steel and cocrete will go in per sqft? an..

Answer / jagan_srinivasan2002@yahoo.co.

3 to 4 kgs per sqft

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

standered size of toilet & bath?also stair-case?

2 Answers  


which is cost effective Steel Structural or Concrete Structure building?

3 Answers  


Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.

0 Answers  


Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot

0 Answers  


What is the percentage of steel in 1cu.m. RCC?

9 Answers  


The corrosion resistance of a material is.

4 Answers  


what is workmanship.

1 Answers  


What"s mean by water bound macadam road(WBM)?

11 Answers   Simplex,


What are the different theories of failure under static load?

0 Answers   Bechtel,


what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE

0 Answers  


4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils

0 Answers  


HOW we can calculate the quantity of sand and cement for 1:4 plastering with a thickness of 12 mm..total area need to be plaster is 985 sqm

5 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)