purpose of binding wire in RCC.
Answers were Sorted based on User's Feedback
Answer / rakesh sharma
Purpose of binding wire in RCC is to keep the reinforcement
in required position.
| Is This Answer Correct ? | 21 Yes | 2 No |
Answer / naren der kumar
To fix the bars in posistion,Where we want.
| Is This Answer Correct ? | 8 Yes | 1 No |
Answer / mohammed aijaz hussain
Purpose of binding wire in RCC is to keep the reinforcement
intact in its required position otherwise it is welded.
| Is This Answer Correct ? | 5 Yes | 1 No |
Answer / ram
To resist SHEAR FORCE, To Hold the MAIN BAR in proper
position, toresist the buristing of Column & Beam
| Is This Answer Correct ? | 3 Yes | 2 No |
Answer / khan
to keep the bar in required proper position and also transfer the load easily to beanm to column to footing to sub soil.
| Is This Answer Correct ? | 1 Yes | 0 No |
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
What is pre-stressed concrete?
how much least count of levelling ?
What is the diff. Between rectangle & parallelogram?
what or who influenced you in making your choice?
Why camber is provided?
2 Answers G R InfraProjects, Tata Steel Limited,
Please tell me present is code no for steel structure work. Thanks.
though u r a civil engineer, y r u interested in tcs???
0 Answers TCS, URC Construction,
what is period of de-shuttering for different area of slab of M25 grade?
cavitations is caused by
slump test report
ground floor columns and beams are reinforced by 4 Num's 16MM @ Corners AND 2 Num's 10MM @ centre.... And the nxt top floor columns and beams were lapped by 8 num's 12MM dia bars..... IS THIS CORRECT ????
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)