hi i'm an Instrumentation student,i have one doubt that we
can call-
> computer science as CS
> Information science as IS
> Electronics & communication as E & C
In the same way what is short term for Instrumentation....?
Answers were Sorted based on User's Feedback
Answer / d4rkhowl
I&C = Instrumentation and Control, Instrumenation field
dealing mainly with control systems such as PLC and DCS,
Programming, Etc.
I&E = Instrumentation and Electronics/Electrical,
Instrumentation field dealing mainly with field instruments
and their installation and maintenance.
| Is This Answer Correct ? | 7 Yes | 1 No |
Answer / rajkumar
probably you will be called as I&C Engr or C&I Engr in future
| Is This Answer Correct ? | 6 Yes | 2 No |
Answer / renjith
In all companies we use INST as short for instrumentation.
| Is This Answer Correct ? | 4 Yes | 2 No |
Answer / aravind
INSTRUMENTATION IS THE FIELD OF SCIENCE THAT DEALS WITH
MEASURING AND CONTROLLING THE PHYSICAL PARAMETERS LIKE
TEMPERATURE ,LEVEL PRESSURE AND FLOW IT IS AN FORM OF
METROLOGICAL ENGINEERING ALSO
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / mansour
INSTRUMENTATION IS MEASURE AND CONTROL THE PARAMETERS LIKE
TEMP. PRESSURE LEVEL AND FLOW.
| Is This Answer Correct ? | 0 Yes | 0 No |
how u choose thermowell lenght n pnumatic C/v size?
re i got gre score of 950,and toefl of 69 is this score sufficient actually my husband is presently in US i need to go please help me
what is the calibration procedure for magnetic flow meter @ onsite
What is the relationship between GAIN and PROPORTIONAL BAND.
1 Answers Kharafi National, Sabic,
the output of the common trasmitter protocol in qatar gas are the following
Where we r using split range and ratio controller?
I want measure the volumetric flow of gas in waste heat recovery Boiler?Tell me how and which type of instruments required. Plz mail me:naba02222@gmail.com Sam please post the answer .
Hi buddies! my name is sachin and i am working as a electrical and instrumentation engineer in a paper plant. right now i am facing a problem and if someone could help me it will be an immense pleasure to me. i am using AC 800M to synchronise DCS500 drives on paper machine and rewinder.communication is on PROFIBUS and we are using NPBA-01 module to link profibus to DC drives.But these days two of these drives are showing a error named FIELDBUS COMM.TIMED OUT and the drives get tripped.I have changed the NPBA module and PROFIBUS cable.So if anyone can do please help me out with this problem.I'll be highly grateful.
What's the difference between cold loop test and hot loop test?
Which language of programing is popular? how can i learn it ?
We have a Yokogawa Micro-XL DCS, which is having around 300 I/O, but whenever there is any wire gets grounded in field, the 24v supply to all loops gets dipped & all the indications at DCS goes to IOP(shows input open), at present we have fixed 500mA fuses in all the lines but which does not working. Does it required to replace with lower amps fuse, then how much or is there any other solution for this.
i have one absolute pressure transmitter for the range is -400mmhg to 400mmhg. If i do the zero trim at atmosphere the transmitter should be give 4ma or 12ma? which one is correct?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)