Answer / hari haran
its cement:fine agg:coarse agg
if we take 1 bag of cement=50 kg
then
cement=50 kg
fine agg=50*4=200kg
coarse agg=50*8=400kg
water cement ratio=0.4
w/c=0.4*50=20 liters of water
| Is This Answer Correct ? | 95 Yes | 23 No |
Answer / arun kumar
ITS MEAN 1:4:8
CEMENT:SAND:COARSE AGGREGATE
MEANS 1 BAG OF CEMENT, 4 BAGS OF SAND, 8 BAGS OF COARSE
AGGREGATES
| Is This Answer Correct ? | 72 Yes | 17 No |
Answer / prashant rawat
M10 grade Ratio is 1:3:6 And 1:4:8 is M7.5
| Is This Answer Correct ? | 49 Yes | 11 No |
Answer / nimmakayala
It not a design mix
It is a lean mix of proportion is 1:3:6(C:FA:CA)
| Is This Answer Correct ? | 29 Yes | 2 No |
Answer / orient builders
1 4 8 means cement sand (fine aggregate) metal 20 mm (coarse
aggregate)respectively.
The ratio is based on volume and not in weight.
one bag of cement is 1.25 cubic foot
Therefore multiply the fine and coarse aggregate with 1.25.
Thus you have to use 1.25 cft of cement (one bag) and 5 cft
of sand and 10 cft of coarse aggregate.
As for sand is concerned bulkage allowance is to considered
according to which the quantity may slightly vary
| Is This Answer Correct ? | 23 Yes | 4 No |
Nominal mix propertion of M10 PCC grade is 1:3:6 & Nominal
mix propertion of M .75 Is pcc grade for 1:4:8
Normally Mix design consider for above M20 grade as for Is
code 456
| Is This Answer Correct ? | 18 Yes | 4 No |
Answer / sunil1505
its not a design mix. after m25 that called design mixes...
1:4:8 cement,sand,aggregate..water ratio is 0.4
m7.5 1:6
10 (1:4:8 and 1 :3:6)
15 1:2:4
20 1:1.5: 3
25 1 : 1 : 2
| Is This Answer Correct ? | 9 Yes | 2 No |
Answer / kumar s
For M-10 grade nominal mix design is 1:3:6
For M-7.5 grade nominal mix design is 1:4:8
As per IS 456:2000, Nominal mix concrete may be used for concrete grades M-20 or lower. Design mix can be arrived with several trial mix design as per guideline proposed in IS 10262:2009. Example my trail design mix for M 10 is 1:3.5:6.10
Hope this will be useful for you...
| Is This Answer Correct ? | 7 Yes | 0 No |
Please send the graphical comparision Viscosity vs temp. for Penetration grade, Viscosity grade & CRMB.
how to calculate for ramp slop?
What is CRMB ? And how it is beneficial to the service life of the road?
10x10 slab design
how calculate the cube strength in percentage
What are the advantages of Prestressed Concrete
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
if the length and breath of footing is 1.2m x 1.2 m what will be the length and breath of foundation trench
how to calculate quantity of steel in a slab , coloumn and beam
1 Answers JSW, Om Sai Builders,
one MT of steel for using how much binding wire required?
How much material is required for constructing a 2 Lane 2Km rigid pavement road
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)