give me the mix proportion for design mix concrete M10 grade
1:4:8
Answer Posted / arun kumar
ITS MEAN 1:4:8
CEMENT:SAND:COARSE AGGREGATE
MEANS 1 BAG OF CEMENT, 4 BAGS OF SAND, 8 BAGS OF COARSE
AGGREGATES
Is This Answer Correct ? | 72 Yes | 17 No |
Post New Answer View All Answers
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
How did street originate in the plumbing term street ell?
What is the sugested procedure of water purification for public supply?
What are the types of slump?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
What is the outturn of Ceiling plastering
Form where IS456 is adopted in 1978?
Explain the water bound macadam roag
Slump Values for works?
how many cement used in single story residential building per sqft
What is the basic difference between OPC
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?