Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is procedure to find the volume of material in M20
concrete?

Answers were Sorted based on User's Feedback



what is procedure to find the volume of material in M20 concrete?..

Answer / ajithprasa vd

M20 means 1 part cement , 1.5 part sand and 3 part aggregate

Cement 7.5 bag

Sand 0.5 M3

Aggregate o.85 M3

Is This Answer Correct ?    8 Yes 1 No

what is procedure to find the volume of material in M20 concrete?..

Answer / engineer harry mrar

403kg cement
.42cum sand
.84 aggregate
181 liter water

Is This Answer Correct ?    3 Yes 1 No

what is procedure to find the volume of material in M20 concrete?..

Answer / ashok sakhare

M20 ratio is 1:1.5:3

(i)Total motor wet = 1+1.5+3= 5.5
(a) Volume of aggregate = 35.5*1.57= 0.856m3 Dry motor/ Cum
(b) volume of sand =1.5/5.5*1.57= 0.3
428m3/ Cum ( Dry motor)
(c) volume of cement =1/5.5*1.57 =( Dry cement) 0.285m3*1440=399 kg.
399/50kg= 7.99bags/Cum

(note: 1.57 for 1m3 Dry motor)

Is This Answer Correct ?    1 Yes 0 No

what is procedure to find the volume of material in M20 concrete?..

Answer / muzammil ahmed

m20=1:1.5:3=5.5, dry mix for im3 is 1.57
1.57/5.5=0.285x30 = 8.5bags OR
=0.285x1500=428.18kg/50=8.55bags(cement)
=0.285x1.5 =0.427x35.28=15cft
=0.285x3 =0.855x35.28=31cft

Is This Answer Correct ?    0 Yes 3 No

what is procedure to find the volume of material in M20 concrete?..

Answer / er z h ansari

It depends on concrete mix design.

Is This Answer Correct ?    4 Yes 11 No

what is procedure to find the volume of material in M20 concrete?..

Answer / i.rajamohamed. p.s.y.e.college

M20 ratio is 1:1.5:3( TAKE 20mm aggregate)

(i)add ratio= 1+1.5+3= 5.5

(a) volume of aggregate = 1\7*1.57 = 0.22m3
(b) volume of sand =1.5/7*1.57= 0.33m3
(c) volume of cement =3/7*1.57 = 0.67m3*1440=964 kg.

(note: 1.57 for 1m3 box)

Is This Answer Correct ?    5 Yes 16 No

Post New Answer

More Civil Engineering Interview Questions

how many weight of 1Cum Sand ???

4 Answers   CCC,


Concrete could be defined as, (1)An artificial stone (2)Structural stone (3)Strong stone (4)Rock and Sand stone

1 Answers  


For what purpose bedding is used under storm water drains, explain?

0 Answers  


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

0 Answers  


Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet

0 Answers   Jain Associates,


if 20mm & 10mm coarse aggregate we have consider same prapotion than how to analysis m25 concrete

1 Answers  


what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.

0 Answers   Gammon,


what are the natural dynamic pressures on a structure in coastal region like chennai, vizag etc,

1 Answers  


57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13&#61602;-9&#61618;, 13&#61602;-10&#61618;, 13&#61602;-09&#61618; Bottom Length - 13&#61602;-11&#61618;, 13&#61602;-10.5&#61618;, 13&#61602;-10&#61618; Top width - 8&#61602;-7.5&#61618;, 8&#61602;-8&#61618;, 8&#61602;-7&#61618; Bottom width - 8&#61602;-7&#61618;, 8&#61602;-8&#61618;, 8&#61602;-7.5&#61618; Depth - 2&#61602;-0&#61618;, 1&#61602;-11.5&#61618;, 1&#61602;-10&#61618;, 1&#61602;-11&#61618;, 1 &#61602;-10.5&#61618;, 1&#61602;-11.75&#61618;, 1&#61602;-11&#61618;

0 Answers   L&T,


what,s the clear cover of beam,slab,column,lintel and foundation?

36 Answers   Max Myanmar, Spar Geo Infra, Yashwant Construction‎,


WHAT IS THE LAP LENGTH FOR COLUMN WITH DESIGN MIX M-35 RCC

7 Answers   Omaxe, Shoba Devlopers,


Explain what is the difference between built area and super built up area?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)