how to find number of 16mm bar reqired for 5m length with 125 mm spacing ?
Answers were Sorted based on User's Feedback
Answer / zaid
number of rods = (length/spacing)+1 = (5/0.125)+1
= 41 numbers of 5m of 16mm are required
to find how many full rods i.e 12m are required
= (41no*5m)/12
= 205m/12m
= 17numbers of 12m
| Is This Answer Correct ? | 8 Yes | 1 No |
Answer / lalit kumar
Number of bars = {(length in which the bar needed to be provided - 2(side cover))/ c to c spacing in b/w bars} + 1
No.of bars= {(5.0 - 2 X. 0.04)/0.125} + 1
No of bars= 40.36 or say 41 bars
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / vikas d v
it is simple 5000/125=40no+1(extra) of rods there is nothing to do with length of rod
| Is This Answer Correct ? | 1 Yes | 0 No |
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
Difference between tension and compression zone
Find out the Cutting Length of Closed Hoop 2 Legged Stirrups for Beam as mentioned. Beam Size :200x300 mm,Nominal cover for all sides :25 mm,8 mm dia. Fe415/500/550.
A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?
the steel diameters(mm) as 6,8,10,12,14,16,18,20,25,28,32...etc these are used in construction work but which mm size can be used for different structural element such as beams,columns,slabs,footing ?
how can we construct building without foundation providing only grade beam at ground level
why we used bricks in brickbat coba? main roll of bricks ? how it function?
3 Answers Brigade, Waskom Construction,
how to check aggregate quantity in stock yard
what is general scouring?
what is difference of NP3 and NP4 pipe and what is the thickness of 1000mm dia NP4 pipe
Why do we use stirrups in columns?
16 Answers Rishi Infra Projects,
How manu days after the casting of a slab another slab can be casted above it? what is the total curing time of a slab if ponding is not done on it?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)