give me the mix proportion for design mix concrete M10 grade
1:4:8
Answer Posted / vimal prajapati
Nominal mix propertion of M10 PCC grade is 1:3:6 & Nominal
mix propertion of M .75 Is pcc grade for 1:4:8
Normally Mix design consider for above M20 grade as for Is
code 456
| Is This Answer Correct ? | 18 Yes | 4 No |
Post New Answer View All Answers
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
How much material will consume for following specification water tank (9*7.5*6 feet)?
what is escalation?how it is done?
How to plan a project
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
What is thumb rule in quantity and cost estimation of a residential building?
What is passive earth pressure ?
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
why are you joining in this (applied post) job and your aim for this job
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
Where is the worlds longest elevator and how long is it?
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
400 ku d/c clearess ketan hota hai?
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?