DG B-check,C-Check,D-check is depending upon the running
hrs.If the running hrs is not reached as mentioned.How to
conduct the DG checks.
Answers were Sorted based on User's Feedback
Answer / omprakash
B. CHECK 250 HRS OR 6 MONTHS
C. CHECK 1000 HRS OR 1 YEAR
D. CHECK 1500 HRS OR 2YEARS
| Is This Answer Correct ? | 90 Yes | 26 No |
Answer / neeraj
DG check can also be done after completion of period like 3
months 6 month and 12 months
| Is This Answer Correct ? | 71 Yes | 23 No |
Answer / arunselva
A Check Daily check
B Check 250Hr to 300Hr or 6 Month
C Check 1000Hr or 1Year
D Check 1500Hr or 2Year
| Is This Answer Correct ? | 57 Yes | 20 No |
Answer / ganesh singh
A-check Daily
B- check 300 hrs or 6 month All filter & lube oil change
C-check 1500 hrs or 1 yrs (Tapit setting)
D-check 5800 hrs or 2 yrs (HPIT seting)
E-check 10000hrs overhalling (crank
grinding,shaft,actuatoer etc)
| Is This Answer Correct ? | 36 Yes | 6 No |
Answer / baskaran.r
the checks are depend on the running hrs. if it is not
reached means engine is not running ok.you can wait till the
running hrs reached. if the stoppage is long you can go
according preservation requirement by the manufacturars
recomendation
| Is This Answer Correct ? | 43 Yes | 15 No |
Answer / mayank sharma
DG Checks are depand upon running hours but if running hours is not reached then we should conducts checks as per the time duration as listed below :
A Check - daily
B Check - 300hrs. or 6 months( filter change, lube oil change)
C check - 1500 or 1 year(A+B checks+ injectors & turbo charger cleaning )
D Check - 5000 hrs. or 2 year( A+B+C Checks+ Tappid setting )
| Is This Answer Correct ? | 14 Yes | 1 No |
Answer / pavan
If it is not reach the running hours.we can take the number
of days from its working.
| Is This Answer Correct ? | 26 Yes | 14 No |
Answer / sk ajibar rahman
"A" - Daily Checks
"B" - 300 Hrs or 6 Months
"C" - 600 Hrs or 12 Months
"D" - 1200 Hrs or 24 Months
| Is This Answer Correct ? | 27 Yes | 15 No |
Answer / biswajeet
the checks are depend on the running hrs. if it is not
reached means engine is not running ok.you can wait till the
running hrs reached. if the stoppage is long you can go
according preservation requirement by the manufacturars
recomendation
| Is This Answer Correct ? | 12 Yes | 7 No |
Why Indian Electricity frequency desined 50 Cycles as developed countrys are using high frequency with low voltage
Why the Motor takes High Current in Starting time?
when the motor was star position that is running ok but when the motor was delta it was tripped? why?
5 Answers Nimbus, SEL Manufacturing,
design a LV scheme for a 15 storied building?
What are documents to be required for export of the material?
define electrical field?
How we calculate the average power factor if the one phase is lag and another one is in lead?
what is cro
Im designing APFCR Panel for 600 KVAR.I need to calculate the full current so that i can choose the capacity of isolator/Breaker.Kindly suggest with formula.
Why AC current leads voltage in capacitor and how?
Witch do depand of Power factor and theory of power factor?
how does it help for selection of a transformer.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)