DG B-check,C-Check,D-check is depending upon the running
hrs.If the running hrs is not reached as mentioned.How to
conduct the DG checks.
Answer Posted / pavan
If it is not reach the running hours.we can take the number
of days from its working.
| Is This Answer Correct ? | 26 Yes | 14 No |
Post New Answer View All Answers
Is there any rule to select the voltage of motor based on KW rating? What is the rating above which lt motor becomes the HT motor?.
How do we calculate the Out put voltage of generator, after the excitation is being given?
WHAT IS THE SIGNIFICANCE OF VECTOR GROUPS IN TRANSFORMER? WHAT WILL BE EFFECT WHEN PHASE DISPLACEMENT CHANGES IN TRANSFORMER?WHAT IS THE NEED TO BE PHASE SHIFT CHANGE BETWEEN THE PRIMARY AND SECONDARY WINDING
how to calculate the magnetizing current of ct ( 800A/1A) for Relay 64
How to calculate flow of water delivered by pump when pressure & size of pipe line is given
What are the various types of rotor used in the alternators?
is that any software calculator to calculate the size of cable
what is earthing transformer? draw the winding dia.of earthing transformer.
when we have to purchase the transformer by own i.e how much load will preferred HT connection?
Why can't we parallel Voltage transformer secondary circuits?
The size and construction of bushings in a transformer depend upon?
What is the tests required for a 132 kV, 400 kV , 765 kV for a Circuit Breaker and Power Transformer before commissioning ?
why moisture formation found in XLPE Armoured cable outer sheath
why we change the direction of winding in rotor ?how we make the north and south pole?
what does mean of RCT and STR in diffrential CT?