DG B-check,C-Check,D-check is depending upon the running
hrs.If the running hrs is not reached as mentioned.How to
conduct the DG checks.
Answer Posted / arunselva
A Check Daily check
B Check 250Hr to 300Hr or 6 Month
C Check 1000Hr or 1Year
D Check 1500Hr or 2Year
| Is This Answer Correct ? | 57 Yes | 20 No |
Post New Answer View All Answers
PLZ EXPLAIN THE INTERLOCKING AND CONTROLLING OF CONTACTORS????HOW CAN I DO THAT?
Why field rheostat is kept in minimum position while armature rheostat at maximum position?
Why we use mho Relay in long transmission line?
How can we find the breaking capacity of a Load breaker switch (LBS) fed from 11 kv supply??ex:50KA, 26kA etc???detailed step vice answer pls.
What is the difference between PLC and Embeded system
What is the principal of motor?
What are the advantages of autotransformer?
can anybody tell me that for p.f. Improvment we use capacitor banks but how to decide its capacitance. As we all know how to calculate kvar but what abt capacitance value
at meter room 50 hrc switch installed,but there are not get earthing proper,so what happen?and 11kv transformer out put going in to hrc main 400a three nog each? so earthing is require for all switch? (some customer made earthing at there home.)
If there is major % of Voltage harmonics in the system, how can it be control or reduced?
WHAT HAPPENED DC SERIES MOTOR FIELD WINDING OPEN. CAN POSSIBLE.
How to check the LM324 Ic
If we are given a 10 amp cable type and asked to calculate the number of cores used and the thickness of the cable, how do we do it?? please help...urgent!! i hope the question is clear enough!!
can any one suggest me the tilt angle of my solar pannel ?? or tell me how can i know the fix tilt angle of my solar pannel?? my cordinates are 31.503629,72.993164.
What is VSCF windelectrical system?