DG B-check,C-Check,D-check is depending upon the running
hrs.If the running hrs is not reached as mentioned.How to
conduct the DG checks.
Answer Posted / mayank sharma
DG Checks are depand upon running hours but if running hours is not reached then we should conducts checks as per the time duration as listed below :
A Check - daily
B Check - 300hrs. or 6 months( filter change, lube oil change)
C check - 1500 or 1 year(A+B checks+ injectors & turbo charger cleaning )
D Check - 5000 hrs. or 2 year( A+B+C Checks+ Tappid setting )
| Is This Answer Correct ? | 14 Yes | 1 No |
Post New Answer View All Answers
how to calculate the earth mat design in 132 kv substation yard ????
What are the effects of adding a zero to a system?
mccb service sittings be done?
What tests should i carry over on a newly rewinded DC Generator with voltage rating of 38 volts and current rating of 350 amps, to certify that the machine is OK?
why ct ,cvt should be stored in a vertical position?
how to caculate cable size for diff types of loads? if anyone know the calculating procedure please tell me
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
What is the difference between AC and DC injection methods for rotor earth fault protection
A cotter joint is generally used to transmit
What is depreciation factor?
PLEASE SEND THE PREVIOUS YEARS QUESTION PAPERS OF RRB JUNIOR ENGINEER-ELECTRICAL
primery try cell?
how can we phase identification in a distribution line,how we recognise that which phase is coming for a house hold connection.help me............
Vaccum circuit breaker
How to calculate the External Resistance required for 60HP slipring motor in case no any data of the Motor is available???