DG B-check,C-Check,D-check is depending upon the running
hrs.If the running hrs is not reached as mentioned.How to
conduct the DG checks.
Answers were Sorted based on User's Feedback
Answer / rajakumar k j
this check is preventive maintainance of DG sets(1000-1500KVA).
1) A-check is done on daily basis here we check:
a) oil level
b) coolant level
c) gauge valve level
d) check for any leakage.
e) cleanliness of DG set.
2) B-check(done after 300hrs of cycle or 6 months whichever is earlier. )
a) check lube oil filter
b) fuel filter
c) air filter
d) bypass filter
3) C-check(done after 1500hrs of cycle or 3yrs whichever is earlier.)
a) all steps of b-check.
b) check/change of air filter (if needed).
c) check/change of other filters mentioned in b-check.
d) change of gaskit of chambers.
4) D-check
a) done in 6000 hrs of cycle.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / b.shekhar
B. CHECK 250 HRS OR 6 MONTHS
C. CHECK 1000 HRS OR 1 YEAR
D. CHECK 1500 HRS OR 2YEARS
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / o.ravindra reddy
A-Check Daily basic
B-Check 250-300hrs and 6months
c-Check 1500hrs and 1year
D-Check 6000hr cycle
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / p.murugan d.e.e.e, b.e(e.e.e)
RUNNING HOURS NOT REACHED DID NOT CONDUCT B,C,D,CHECK NO
PROBLEM. BUT DAILY CONDUCT A CHECK VERY VERY IMPORTANT
IMPORTANT PART OF THE DG SET 1.LUBRICATING SYSTEM, OIL LEVEL
2.BATTERY VOLTAGE, SPECIFIC GRAVITY,3.CONSERVATOR WATER
LEVEL,4.FUAL FILTER, WATER SEPERATER, ALL FUAL
TEMPERATURE,5.ANY LEAKAGE FROM ENGINE HOSE& PARTS 6.COOLING
SYSTEM &COOLING TOWER. THIS ALL CONDITION GOOD NOT CONDUCT
B,C,DCHECKS.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sharath patel
if the running hours not reached means we can conduct the
checks by the number of days from the comissioning date.
| Is This Answer Correct ? | 7 Yes | 9 No |
Why annealing is done on transformer core manufacturing process?
i have applied for junior engineer 2 c&w for Guwahati RRB please send me last five year question paper
what are the maximum available current, voltage ratings and switching speeds of the power electronic devices thyristor, power mosfet, igbt, and mct?
how can we minimize the off load losses of a distribution transformer which is required to be energized 24x7 ?? capacity of the T/F is 1250 KVA and off load losses are around 2.0 KW.. can we use capacitor bank at the secondary of such a T/F to overcome off load losses? please elaborate briefly...thanks
What is bridge rectifier and explain with details
how to identify 3phase....r y b .A new make altnator how to identify R
For an induction motor wat is the loading/unloading cycle duration or interms of L/UL ratio/ percentage?
How to calculate phase to phase difference ?
Stator of three phase induction motor creates Rotating Magnetic field.But why not Transformer?
How to detect voltage vector shifting in interconnection protection.
what is suitable cable for 25 HP motor ? start with VFD ac supply 50 hz
what is diff kav & kvarh?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)