DG B-check,C-Check,D-check is depending upon the running
hrs.If the running hrs is not reached as mentioned.How to
conduct the DG checks.
Answer Posted / sk ajibar rahman
"A" - Daily Checks
"B" - 300 Hrs or 6 Months
"C" - 600 Hrs or 12 Months
"D" - 1200 Hrs or 24 Months
| Is This Answer Correct ? | 27 Yes | 15 No |
Post New Answer View All Answers
please send me the L&T Emb. sys. placement papers and entire details of pattren
what questions are asked in the interview for the post of an electrical maintenance engineer in FMCG companies?
what is The difference between national electrical code and I.S.Code (electrical) and what is the value of NEC in electrical engineering field
how many synchronous motor are there in any power plant
BRIEFLY EXPLAIN THE STORAGE CLASSES AND THEIR TYPES IN C
What is meant by system?
List of equipments required foe industrial repair lab.
in star-delta tranformer,if the input of star connection is 400/7v 3 kva then what is the output of delta connection?
Earth bits close or open. Which is correct
what is the effect of un-synchronized power.
what is the condition for YnD11
What will be the effect of circulating current in HT xlpe cable when both the armour ends are grounded. Will the termination fils after some time in case of 33 kv supply.
what is the profesional board for electrical engineer what is thepast and during construction for electrical engineering
why the check zone and main zone are used for Busbar Protn. scheem?
The windings of a transformer are divided into several coils, because?