DG B-check,C-Check,D-check is depending upon the running
hrs.If the running hrs is not reached as mentioned.How to
conduct the DG checks.
Answer Posted / sk ajibar rahman
"A" - Daily Checks
"B" - 300 Hrs or 6 Months
"C" - 600 Hrs or 12 Months
"D" - 1200 Hrs or 24 Months
| Is This Answer Correct ? | 27 Yes | 15 No |
Post New Answer View All Answers
how we decide the require size is this for a known current at fuu load?
i have flexible wire. size of conductors is 0.190 mm & no.of conductors are 48. then size of wire comes 1.37 sqmm instead of 1.5 sqmm . the what is tolerance for this size.
Why we use duplex coil and hook switch in telephone system?
why dimmerstate always connected in star connection? what will happen if it connected in delta?
Explain about Dubai electrical sysaem? Explain about Dubai drinking water system? Explain about Dubai Burj tallest building Electrical,Water.etc.. maintenance system?
The 3 phase 400 hp 440 volt slip ring induction motor do not take one phase amps why ? The motor is running good condition
i applied for the ap transco please forward the freqventley asked QA
what is the difference between Power and Distribution transformers ?
What is shunt voltage and u v voltage witch one best
Can 4pole (3 phase+neautral )RCCB proper functioning in only 3 phase load (no neautral, no Earth) ?
How to calculate the sag of OPGW during stringing???
What is d main advantage of using double circuit 3 phase transmission ?
Define rise time.
what is the power rating of CPU, CRT type moniter, LCD type moniter,scanner Approx.
how to decide no of electrodes for 1600A LT Main incomer panel