DG B-check,C-Check,D-check is depending upon the running
hrs.If the running hrs is not reached as mentioned.How to
conduct the DG checks.
Answer Posted / neeraj
DG check can also be done after completion of period like 3
months 6 month and 12 months
| Is This Answer Correct ? | 71 Yes | 23 No |
Post New Answer View All Answers
difference between main metering kiosk and check metering kiosk
How they LT panel busbar size choose
The power supplied to a 50mH inductor from a 120V, 60Hz source will be
WE ARE PLACE A NEW 75 KW MOTOR FOR JPF.IT IS CONNECTED IN M.C.C. WHEN WE ARE STARTING M.C.C.INCOMER IS TRIPPED.THEN WE ARE CONNECTED IN P.C.C WITH A MM30 RELAY PROTECTION THEN WE ARE STARTED MOTOR WILL RUN SMOOTHLY.
What is synchro?
1. If 8.35%Z means the percentage impedance of 132kV-line from power company, we will like to reconfirm its base capacity.
-What should be minimum value of insulation resistance and maximum value of earth resistance at any electrical instillation and what is method of testing the same.
I want to do a mini project. Now I'm studying in 6th semis tor EEE Engineering.
How to find ampere on ht side for selection of cable size ???
I'm looking for a softcopy manual set for a Credence ASL- 3000. Anyone know where I can get it?
Explain in details how you would react to an unexpected incident when your supervisor or manager is not around to give instructions?
give single line diagram of D.G distribution form alternator to main L.T panel?
please I wont know how to calculate the vector group for power transformer ZNyn11 best regard.
I have 4 DG set with 1500KVA rating. system breakers are 11KV & alternator are 415 Volts. Between alternator & breaker one stepup transformer used. i want to Know what is max. resistance for body earthing & 415 & 11KV V Neuteal earthing. my fault current is 14 times for 2 sec.
Distinguish between nuclear power station with thermal power station for initial cost, starting period, cleanliness, and transportation of fuel