I want to know if it is possible to use Variable Frequency
Drive to reduce the current required for starting a motor?

Answers were Sorted based on User's Feedback



I want to know if it is possible to use Variable Frequency Drive to reduce the current required fo..

Answer / muili ibrahim babatunde

VFD is an acronym for variable frequency drive. It is not meant for varying frequency only, It also reduces current starting.   

Is This Answer Correct ?    1 Yes 0 No

I want to know if it is possible to use Variable Frequency Drive to reduce the current required fo..

Answer / guest

Yes.

Is This Answer Correct ?    1 Yes 2 No

I want to know if it is possible to use Variable Frequency Drive to reduce the current required fo..

Answer / guest..

no.. how is this possible? i dont know... vfd used for rpm increase r decrease... this one posible... i think..

Is This Answer Correct ?    1 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

what is the difference between electrical & electronics?

4 Answers   JSW,


in my observation NCT is used at Karnataka power transmission. why we are not used in andhra pradesh

1 Answers  


what is SWA type of cable?????

4 Answers  


Dear friends, i would like to know that what is the exact function of 'exciter winding' & 'aux winding' in Alternator?

0 Answers   NTPC,


Hi.. I am a BE GRaduate in E&E. I have 8.5 Experience in Tendering & Estimation field. I have done SAP SD course few years back. But due to some reason i failed to get job in that field and continued my own field. Now I am thinking of changing into SAP seriously. How should i go ahead???

0 Answers  


how air lock will be removed from generators, how it happens?

1 Answers   ABC Engineering,


VCB in closed position during opertion if vaccume break then what will happend? it has any protection ?

1 Answers  


WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.

0 Answers  


What are the usege & different between UPS & batteries with charging system in in Substation?( UPS 120V AC & battery charger is 120v DC)

1 Answers  


what is the cable size we can use for 11kv and 33kv ?

3 Answers  


what is meant by VDC ?where its applicable ?

2 Answers  


how we can use resistance heating for any domestic purpose???

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16637)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)