What are different MRP types?
Answers were Sorted based on User's Feedback
Answer / hemant baviskar
MRP type determines whether and how the material is
planned.For different requirement the different types are
available in SAP. "PD"for exploding the BOM & generate the
requirement."VB" for manual reorder point,"VM" for
automatic reorder point. etc.
Is This Answer Correct ? | 123 Yes | 17 No |
Answer / santosh k
There are many types of MRP types as
1}PD
2}M0
3}M1
4}M2
5}M3
6}M4
7}VB
Is This Answer Correct ? | 80 Yes | 27 No |
Answer / mobeen ahmad
there is one more type ND ,used for no planing generaly
used in by products.because u are not planing for it.
Is This Answer Correct ? | 72 Yes | 22 No |
Answer / vadivel
The differnt types of planning procedures are
1. MPS - Master Production Scheduling
2. MRP - Material Reuquirements planning
3. Consumption based planning - (there are two types)
i) Forecast based planning
ii) Reorder point planning
a) Manual Reoderpoint planning
b) Automatic reorderpoint planning
Is This Answer Correct ? | 55 Yes | 16 No |
Answer / v.ramachandran
# Master Production Schedule
# Material Requirement Planning
# Consumption Based Planning
Automatic reorder level planning
Manual Reorder Planning
Is This Answer Correct ? | 44 Yes | 14 No |
Answer / animesh kumar
1. MRP - PD: -
2. Consumption based planning: -
a. Re order point planning: - When the stock level
reaches the reorder point set taking RLT into
consideration, the procurment order is created
automatically without considering PIR or CIR.
b. Forcast based planning: - here procurment is based
on forecat.
c. Time based planning:- Here procurment is done in
regular interval.
3. MPS: - this is set for critical material which are
excluded from MRP.
4. NO MRP: -
5. MRP in external planning: - This is set when an
additional planning tool like APO is set and planning is
done in APO.
Is This Answer Correct ? | 34 Yes | 5 No |
Answer / jinchandramule
MRP Type:
Key that determines whether and how the material is
planned. You have the following options:
Manual reorder point planning (VB)
Automatic reorder point planning (VM)
Forecast-based planning (VV)
Material requirements planning (PD)
No planning (ND)
Time phased planning (R1)
Master production scheduling (MPS)
THHANKS
Is This Answer Correct ? | 22 Yes | 2 No |
Answer / anand patil
there are one more type of MRP XO which planning can done
in APO and purches order in R/3.
Is This Answer Correct ? | 21 Yes | 7 No |
Answer / miten dalwadi
M0
M1
M2
M3
M4
ND
P1
P2
P3
P4
PD
R1
R2
RE
RF
RP
RR
RS
V1
V2
VB
VI
VM
VS
VV
X0
Is This Answer Correct ? | 21 Yes | 12 No |
Answer / ganesh
Following mrp type are defined in SAP
ND for no MRP
PD for MRP
VB for manual reorder point planning
VM for automatic reorder point planning
V1 manual reorder point planning including external requirement
V2 manual reorder point planning without external requirement
VV for forcast based planning
Is This Answer Correct ? | 4 Yes | 0 No |
What is plm (product lifecycle management) in sap pp?
What are the production process in sap?
what is the significance of process order over production order
5 Answers Cap Gemini, IBM, PCS,
What do we do in realization phase?
In project the customization is comes under which phase?
In om, how to get the details for a group of employees (ex.) Group of drivers in the organization?
Mention what are the keyfields found in mrp view 1?
What is qualification deficiency? How will you come to know that a person does not have certain skills/qualification?
What is MTS and MTO and the difference between them?
Mention what is the use of t-code cs20 in bom?
Have idea about variant configure
2 Answers Accenture, ASD Lab, Cap Gemini, IBM, Sunbeam,
why their is need of production version