What is planning horizon?
No Answer is Posted For this Question
Be the First to Post Answer
What is alternative bom
Explain Flexible Planning procedure or How many levels of Flexible planning.
Integration between PP and MM Module.
What are all the ‘technical types of bom’?
What is mrp group and what is the use of it?
What is MRP Area or How can I excluede one storage location stock from MRP?
Explain the Difference between the Discreet and REM.
Control keys
How requirements( pir, sales order, customer requirement) are reduced after they are produced?
what is the difference between PP and PP-PI? Which one is better and how? Please explain some body in detail.
Explain the mrp controller and their uses.
You want to insert an inspection check point at the end of an operation. How would you do that?