Answer Posted / ganesh
Following mrp type are defined in SAP
ND for no MRP
PD for MRP
VB for manual reorder point planning
VM for automatic reorder point planning
V1 manual reorder point planning including external requirement
V2 manual reorder point planning without external requirement
VV for forcast based planning
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Scheduling times can be defined in the material master record by?
What is collective order. Pre requisite of the collective order?
how many times pcc can run for one material?
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
What is a ‘routing’ in pp?
Why is work scheduling required for semi finished and finished products?
Both labor and machine categories exist. How would you calculate the process time?
Explain DMR.
What are basic dates?
We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?
How does sap know that an operation has components as indicated by the component allocation indicator?
How to delete a group of products that was created in screen mc84 ?
What are the questions we need while we go company for analysis to implementation SAP? What we need to know generally? How can we define we need abab for improvement?
Explain what happens to planned after it has been converted into production order?
What parameters you maintain in “plant parameters” in configuration?