Answer Posted / hemant baviskar
MRP type determines whether and how the material is
planned.For different requirement the different types are
available in SAP. "PD"for exploding the BOM & generate the
requirement."VB" for manual reorder point,"VM" for
automatic reorder point. etc.
| Is This Answer Correct ? | 123 Yes | 17 No |
Post New Answer View All Answers
How requirements( pir,sles order, customer requirement) are reduced after they are produced?
What are the keyfields found in mrp view 1?
In tm, if a group of employees gets 10 days of annual leave, what will be the time evaluation status?
What are all the steps involved in Variant Configuration?
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
After doing realization how we will check whether it is working or not?
define variable cost
What do you do to run MRP for just one MRP Controller?
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?
What is the SPRO Path for requirement class and req. type?
Explain In-process inspection.
Explain source inspection.
How the process time is calculated in a wc when both labour, machine categories exist?
What is mrp list and what is the use of it?