Answer Posted / animesh kumar
1. MRP - PD: -
2. Consumption based planning: -
a. Re order point planning: - When the stock level
reaches the reorder point set taking RLT into
consideration, the procurment order is created
automatically without considering PIR or CIR.
b. Forcast based planning: - here procurment is based
on forecat.
c. Time based planning:- Here procurment is done in
regular interval.
3. MPS: - this is set for critical material which are
excluded from MRP.
4. NO MRP: -
5. MRP in external planning: - This is set when an
additional planning tool like APO is set and planning is
done in APO.
| Is This Answer Correct ? | 34 Yes | 5 No |
Post New Answer View All Answers
Differentiate ‘variant bom’ from ‘multiple bom’?
What is the difference between the fixing type 1, 2, 3, 4?
If u maintain sub-contacting where and how will be reflect
What do you mean by pooled capacity?
Question related to Production order status or status profile?
What is recursive BOM
What is the use of infogroups?
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
How to create prt master records?
In lsmw which is most important step?
Difference between byproduct and co-product.
How can I use variable size items?
Explain about rough cut planning
Are there any reports in sap to list of material requirement from ltp ?
In project the customization is comes under which phase?