Answer Posted / parthkumar salunke
up to plinth level it is called substructure and above
plinth level it is called superstructure.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
what r you reqired for concrete baching plant?
Explain what is alternate bid?
How to do bbs in excel format
How much cement is require in one sqft area in a G+3 residential construction.
sir how can we find the cement and sand required for making 4" drop
what could be the production cost of 1 cum of concrete by CP30 plant
What are your future hopes for this job?
how many types of survey and what are levelling instrument?
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
What glue is least sticky?
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
Calculation of Pier Cap with tapper area?
how to preaper for interview wat they asked in interview give me idea
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
How to calculate canal slope curvature qty!