Answer Posted / parthkumar salunke
up to plinth level it is called substructure and above
plinth level it is called superstructure.
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
Define What is diversion tunnel in a dam?
Did any of the egyptian pyramids ever fall down?
what is the difference b/w full length and cutting length?
How do you measure water flowing through 300mm diameter pipes?
What is GSB gradation
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
What black man invented the clothes dryer?
What is bmc stands for in bmc software?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
Why is concrete cube test carried out?
What is the absolute pressure scale?
how can we calculate steel value, depending on load