Answer Posted / kiran
structure that built above the ground, which is rests on
foundation?
| Is This Answer Correct ? | 46 Yes | 7 No |
Post New Answer View All Answers
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
What is the effect of a building collapse?
What is bylayer?
How long does it take concrete to harden?
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
Slab quantity
What is limit state method and working stress method and ultimate method
how to calculate spacing rod in column
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
what is the difference between tsp & tower
How many cum of 9.5mm stone in 1 ton ?